He d like to be able to have a vaulted look by adding rafter ties removing the ceiling joists and drywalling the rafters leaving the ties exposed as faux beams.
Replacing joists in roof.
Per square foot for live load.
Before you replace damaged floor joists you must exterminate the insects or improve the drainage and ventilation so the problem won t reoccur.
In order to get at the broken roof joist you will need to either go into the attic or remove the ceiling tiles.
Per square foot at 24 o c.
Use your tape measure to record the distance of both rafter legs.
The current ceiling joists are 6 and follow the rafter spacing.
A new piece of timber is cut a to replace the damaged piece and the joists plates are positioned ether side of the joists with the end of the joist plate right up against the edge of the timber so it is the joist plate that site on the bearer a.
Step 2 measure roof joist.
For a 10 span.
The original structure is 24x24 with 6 rafters spaced about 20 apart on a 6 12 roof.
Use a circular saw to cut two sets of new rafters from the same size wood by the same dimensions.
Step 5 add.
Step 1 locate broken roof joist.
Repeat the process for the joist beneath your old roof rafter.
Resin is then poured in to the slot to secure the new beam end.
Half the 23 minus 18 for the roof tie depending on local codes and snow load requirements that would allow for about 15 lbs.
A vertical slot is machined in the joist.
Repairing roof joists yourself step 1.
How to repair a roof joist.
2x6 pine lumber 2x4 pine lumber spax screws or bolts a saw of some sort for cutting down the lumber.
The wood should come away quite easily without much force.
Per square foot for dead load framing and roofing and about 25 lbs.
The new end is then fitted with the bars going in to slot.
Typically floor joists are repaired or replaced working from below in a basement or crawl space.
Measure the dimensions of the old rafters beneath your roofing surface.
A 2x6 roof joist old size sawn framing can support about 40 lbs.
The joist plate is bolted to the timber making the joint b as strong as the original joist.
Costs will vary widely depending on the extent and nature of the original problem.
If only part of the joist is damaged measure the space.
Step 3 cut new roof joist.
A new joist end is drilled to so two or more steel bars can be glued resined in.