Cut the nails at the bottom of the row above the boards you re replacing.
Replacement clapboard siding.
However the amount of present rot can be deceptive.
To make the replacement clapboard measure the location of the old one not the board you just removed.
Carefully lift the panels above and below the damaged panel.
Use a square to mark the cutting lines centered on a stud.
Insert the tongue into the groove above and start working the siding behind the trim using a wood scrap gently tap the siding into place from the opposite end to finish the job nail your new piece of siding to the studs using hot dipped galvanized nails.
0 375 in x 12 in x 192 in.
If you have damaged wood shingles you may be able to seal small less than 1 16 inch cracks with a flexible exterior grade paintable caulk and paint it to match your siding.
Pull nails from split clapboard.
Before installing the.
Lp smartside smartside 38 primed engineered lap siding common.
To remove pry them from the house with thin pry bars and a hammer.
A single rotted clapboard can usually be replaced by the homeowner or the commercial maintenance crew by using the old rotted clapboard as a measurement board for the new siding plank.
Your clapboard siding repair is almost complete.
How to replace damaged clapboards step 1.
Tap flat bar under siding to loosen nails.
Secure old siding by driving ring shank nails down at an angle through the old nail holes.
Add new siding we used cedar siding to replace the rotted clapboards.
If you have to replace 3 or 12 inch wide clapboard you need a pry bar a hammer a small hacksaw a keyhole saw blunt tipped thin shank siding nails and as many replacement boards as you need that are similar to what s on the house.
Pull loose nails from clapboard siding.
Grab butt edge of damaged clapboard and lift up sharply snapping it.
Use a small hacksaw with a sharp blade.
Stagger butt joints if you re replacing multiple courses.
0 315 in x 11 938 in x 191 875 in item 360718 model 25799.
First to help avoid any future insect damage back prime the cedar with oil based primer image 1.
Before the siding can go up 1x4 starter strips of treated lumber should be nailed to the sill where the lower most course of siding will go up image 2.
Start by identifying the damaged clapboards.
Here s what to do.