Removing Drip Edge From Rolled Roof

How Your Roofer Is Destroying Your House The Craftsman Blog

How Your Roofer Is Destroying Your House The Craftsman Blog

Roof Drip Edge Flashing Installation Faqs Q A On The Right Way To Install Drip Edge

Roof Drip Edge Flashing Installation Faqs Q A On The Right Way To Install Drip Edge

How To Install Roll Roofing Do It Yourself Pj Fitzpatrick

How To Install Roll Roofing Do It Yourself Pj Fitzpatrick

Iko Roof Fast Application Instructions Iko Roofing

Iko Roof Fast Application Instructions Iko Roofing

How To Install Drip Edge The Proper Way Queen Bee Of Honey Dos

How To Install Drip Edge The Proper Way Queen Bee Of Honey Dos

How To Install Roll Roofing With Your Own Hands Roll Roofing Shed Roof Felt Shed Roof

How To Install Roll Roofing With Your Own Hands Roll Roofing Shed Roof Felt Shed Roof

How To Install Roll Roofing With Your Own Hands Roll Roofing Shed Roof Felt Shed Roof

Gently lift up the shingles along the lower edge of the roof and find the nails attaching the eave strip to the roof.

Removing drip edge from rolled roof.

Install peel and stick roofing in a similar manner. Attach with nails along the top edge of the strip. At the eave i d guess that if you install the flashing under the roll roofing you d risk getting moisture between the flashing and the roll roofing. Find and fix a leaking roof.

Rip cut the starter strip or starter pieces so that they butt up against the second course of existing shingles and are even with the front edge of the existing roofing. On some roofs you may need to remove a couple of shingle nails to make some room to work. It not only protects the roof but it also protects the fascia. Use a starter strip or cut pieces for a starter course.

This lets any water that gets on the roof run down the underlayment and over the drip edge. Slip the eave strip out from under the shingles. Use a flat pry bar to remove drip edge nails along the eave and rakes. Use a flat pry bar and hammer to remove the nails holding the eave strip to the roof decking.

Metal d flashing or drip edge is sometimes installed only along the eaves edge but it is actually required by the 2012 international residential code irc at eaves and gables of shingle. In most cases if the shingles go past the drip edge about 3 4 of an inch the shingle edge will break the surface tension unless your roof has a shallow pitch then the water will reach the drip edge and if drip edge is tight to the facia board it will run down the fascia so as added insurance leave space between the fascia and drip edge. Tack the end into position with the roofing nails and press the nail within the drip edge and into the roof covering. Raise the shingles and push the top rim of your drip edge beneath them.

12 roof repair tips. The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge. Slide the flat bar under starter course and pry out the nails. But do not push it through the fascia.

Begin at the lower corner of the roof and gradually progress to the top. Drip edge or drip cap is either plastic or sheet metal.

Asphalt Sbs Roll Roofing Installation Details How To Install Roll Roofing

Asphalt Sbs Roll Roofing Installation Details How To Install Roll Roofing

Newly Installed Roof Drip Edge Question W Pics Roofing Siding Diy Home Improvement Diychatroom

Newly Installed Roof Drip Edge Question W Pics Roofing Siding Diy Home Improvement Diychatroom

Asphalt Shingle Re Roofing Guidelines How To Do A Roof Over Vs Doing A Tear Off

Asphalt Shingle Re Roofing Guidelines How To Do A Roof Over Vs Doing A Tear Off

Roofing Does Drip Edge Go Under Or Over Underlayment Or Tarpaper At The Roof Eave Youtube

Roofing Does Drip Edge Go Under Or Over Underlayment Or Tarpaper At The Roof Eave Youtube

Source : pinterest.com